Double Cyclone CFB Boiler Used in Thermal Power Plant

Double Cyclone CFB Boiler Used in Thermal Power Plant

Zhongding coal and biomass fired double cyclone circulating fluidized bed boiler with low speed is a new generation CFB boiler, it is the national patent product of Zhongding Boiler. Circulating fluidized bed boiler is consisted of combustion chamber, separator, fly ash circulating system, superheater, convection bank, economizer, and air preheater. The boiler inherits the original technology advantages, at the same time, makes big breakthrough on the technology of cyclone fluidized combustion, cyclone separator, and loop seal device. The thermal efficiency of coal and biomass power plant boiler is about 5% higher than the other CFB boilers.

The boiler could burn different coal and biomass fuels. The coal could be anthracite, bituminous and brown coal, lean coal, and combustible with coal gangue, gasifier slag, chain slag and other low-grade fuel, also, the slag can be used comprehensively, and the carbon content of the slag is generally below 2%. The biomass fuel could be wood, bagasse, paper products, bamboo, cotton shell, peanut shell, straw, sawdust, coconut shell, etc.

Rated Capacity:

10-130 t/h

Pressure:

3.82Mpa-5.29Mpa

Certificate:

ISO 9001, CE, BV, SGS, ASME

Fuel:

Different coal and biomass fuels

Boilers Structure

Double Cyclone CFB Boiler Used in Thermal Power Plant

1. Integrate furnace, separator and loop seal system by using membrane water wall, compact structure.The water cooling separator skeleton is membrane wall, prevents the low efficiency caused by air leakage. The membrane wall could abort the heat of inner wall, allowing the residual carbon to burn in the separator (do not cause coking).

2. The boiler arranges cyclone combustion device in furnace, achieves cyclone fluidized circulating combustion, improve combustion efficiency.

3. The loop seal device is composed of two membrane water walls, and the heat of fly ash could absorbed by the water wall tubes.

4. The boiler uses low flow rate design, the area of the furnace is large and the smoke speed is low. The buried pipe adopts anti-wear steel with the special size and angle, and reduce the flidization velocity, to reduce the abrasion. The separator is at the outlet of combustion chamber, the large particles of the flue gas are separated, reduce the abrasion of heating surface.

Auxiliary equipment

Air Blower

Air Blower

Use centrifugal blower for ventilation, blower air, convey materials. The blower could be customized based on the specific requirement.

Slag Cooler

Slag Cooler

Choose the high quality slag cooler with strong colling capacity and fast slag cooling speed.

Dust Remover

Dust Remover

There are different type dust removers, we will choose the most suitable one based on the specific requirement.

WATER PUMP

WATER PUMP

We adopts the stainless vertical pump with low noise, stainless impeller and pump body.

Steam header

Steam header

Standard configuration: one inlet, three outlets, equipped with pressure gauge and thermometer. It can be designed according to customers' requirement.

Water softener

Water softener

It is fully automatic and free debugging. We adopts PE material for salt tank body, it has hard texture and it is easy to move, anti-shock, and no leakage.

Quality

Zhongding Boiler pay more attention to the boiler quality from raw material to producing process.

boiler quality
we choose domestic well-known manufacturer who can provide component report of raw material, to ensure the raw material is qualified. After the completion of raw material procurement, there are specialized technicians in our factory to make sampling chemical composition analysis and physical performance analysis, and we can also provide raw materials inspection report.
We adopt numerical control cutting, which has the advantage of high precision, neat cutting surface, nice appearance and high material utilization.
Boiler manufacturing
Boiler production
We adopt submerged arc fully automatic welding. When each welding process is done, the 100% X-ray inspection will be arranged for every welding seam, which can prevent the defective parts from flowing into the next process.

Parameter


  Model
Rated Evaporation (t/h) Rated Steam Pressure
(MW)
Rated Steam Temperature(℃) Feed Water Temperature
(℃)
Coal Consumption (kg/h) Design Thermal Efficiency η Exhaust Gas Temperature (℃)
ZDG-20/3.8-M 20 3.8 450 105 2180 85% 165
ZDG-25/3.82-M 25 3.82 450 105 2860 85% 165
ZDG-30/3.82-M 30 3.82 450 105 4010 86% 150
ZDG-35/3.82-M 35 3.82 450 105 4176 85% 150
ZDG-40/3.82-M 40 3.82 450 105 5347 86% 150
ZDG-45/3.82-M 45 3.82 450 150 5611 85% 150
ZDG-75/3.82-M 75 3.82 450 150 8064 88.5% 135
ZDG-75/5.29-M 75 5.29 490 150 8064 88.5% 135
ZDG-130/3.82-M 130 3.82 450 150 13744 90% 140
ZDG-130/5.29-M 130 5.29 490 150 13744 90% 140
ZDG-220/9.8-M 220 9.8 540 150 23003 91% 140
Note: Parameter is for reference only, the specific should follow the design institution.

Projects

Order Online

Contact us now if you have any question about our company and products chinaboiler [email protected]. Any of your inquiry and suggestion will be highly appreciated. We will keep your information completely private.

*Name:

*Email:

*Tel:

*Message: